This post is already about a week out of date. Last week was a crazy week for me at work (or lack there of) since I was on a rewards trip from one of our suppliers. Anyway, the house has been drywalled, taped, and mudded. We had been told from the start that it would look a lot smaller after the drywall was hung, but Meg and I both seemed to think it looked just fine. It was really neat to see all the rooms take shape, and to our suprise, how large some of them looked.
I'll get this post out of the way, and then hopefully I can get caught up to current progress.
C
Monday, September 23, 2013
Wednesday, September 11, 2013
Post Vacation update
Hard to believe it is already the middle of the week, but after being gone on vacation for a week, it is tough getting caught up.
As expected, it is much longer time periods between substantial progress, but when we got home Sunday and made it out to the house, we found a lot of things done. Most, if not all, of the plumbing, hvac, and electrical rough in has been completed. There were a bunch of inspection tags hanging on one of the outlets, but I couldn't tell if everything had been passed or there were still things missing that needed fixed. Along with all the rough in, our garage doors had been hung as well. The slider for the back door had also been installed. So officially our house is all closed up.
Next step to be completed is insulation, which we hope is done by the end of the week. And if everything is on schedule, they hope to start drywall on Monday! I also noticed that the siding was stocked in the garage, so I could see that starting anytime now as well.
As expected, it is much longer time periods between substantial progress, but when we got home Sunday and made it out to the house, we found a lot of things done. Most, if not all, of the plumbing, hvac, and electrical rough in has been completed. There were a bunch of inspection tags hanging on one of the outlets, but I couldn't tell if everything had been passed or there were still things missing that needed fixed. Along with all the rough in, our garage doors had been hung as well. The slider for the back door had also been installed. So officially our house is all closed up.
Next step to be completed is insulation, which we hope is done by the end of the week. And if everything is on schedule, they hope to start drywall on Monday! I also noticed that the siding was stocked in the garage, so I could see that starting anytime now as well.
Time lapse position 1
What all the rough in in the kitchen looks like
Some of the rough in in the living room
High Five!
C
Subscribe to: