Tuesday, November 12, 2013

Finished

I guess I better finish out our journey.  The house is finished.  I'm going to say that it was completed the Nov. 1st because that is the day the final cleaning took place.  But there were a few small details to finish up.  We had our walk through last Wednesday and did a punch out list with the company who will be servicing our home warranty.  So there were still some minor details to fix.  I still believe the yard needs to be seeded, unless they snuck in and did that yesterday.  And possibly at this point it won't happen until spring.  I just set a closing date this morning for this coming Friday, and Lord willing, we will be closed and moving in to our new home this weekend.

July 24th - We broke ground.
November 1st - Our home was finished.
I believe that comes out to around 101 days.  Absolutely amazing.

C

Monday, October 28, 2013

Finishing touches...

Well we are only a few short weeks away.  A lot of the finishing touches are already in the process, or are done.  In the past week or so, our counters have been put in.  Our kitchen has been basically finished, and our fridge has been installed as well.  Wire shelving in all of the closets have been put in, along with towel bars, tp holders, ect.  Garage door openers installed, and wired.  Plumbing all finished, so we have running water and drains everywhere.  The painters came and touched up trim, along with painting our common grey color in the tall stairway walls. (both Meg and I were at a loss of ideas on how to accomplish getting that area painted) All of the door hardware has been installed.  Basement has been insulated, and plastic covered.  On the outside, the stone accent on the front of the house has been completed.

Small checklist left to do:
Outside:  Final Grade/Seed Grass, Gutters, Light Post, AC unit.
Inside:  Finish minor electrical, hvac, carpet, final clean, and energy diagnostic to get our energy star certified home.

Then it is just down to punch out, appraisal, and CLOSE!



C

Tuesday, October 15, 2013

Transformation Tuesday

Well, as we enter the last month of our building project, the details will become fewer and smaller.  So I thought this might be a fun time to post the progress of our time lapse photos all in one spot, to watch our home come alive.  Happy Transformation Tuesday, and here's to one month til our tentative close date!











C

Thursday, October 10, 2013

Hardwood, kitchen cabinets, and light???

Surprisingly busy week so far at the house.  We stopped out Monday night to find that the hardwood had been laid down in the kitchen, dining, living, .5, and hallway.  They are really dusty/dirty, and if they look like they are all scuffed up already, we picked the the hand scraped option, to give the floor some character, and let's face it, they won't look like new forever anyway.



Andy told us that they would be working on trim and cabinets as well this week, and we were feeling lucky so we went back to the house Tuesday night.  We not only found a majority of the downstairs trim(upstairs was already mostly done) but the cabinets have been set as well!  It was after dark until we made it out there, so no pics from Tuesday night.

Last night we met with the bank to get our financing in order, and when we left, it was still light, so we decided to try to get to the house before it got dark so we could see the cabinets.  As we approached the front door I noticed there was a doorbell and it was lit up, and then I noticed the light was hung under our covered porch.  I opened the door and started flipping switches.  WE HAVE LIGHTS!  Not all of them, but a lot of them, and it made exploring the house so much fun.  Trying switches here and there to see what all worked.

So here is a sneak peak of the kitchen, and living room.  Trimmed, with some lights. Ta da!


Oh, and assuming everything happens on schedule, both with the house and bank, we have set a tentative closing date of NOV 15th!!

C

Friday, October 4, 2013

Picture update

I know I am long over due for some pictures.  Meg and Sarah were working on a painting project, but I stopped by for a few minutes and grabbed a couple outside shots.  Concrete work is finished.  All the duct work for HVAC is finished.  Plumbing appears to be finished.  Outlets and light switch boxes wired.  Flooring still hasn't started.  Bummed about that.

Without further ado...

Time lapse position #1
Time lapse position #2
We are waiting for the stone work, and you can see the small patch on the garage wall where the siding isn't quite finished yet.
Time lapse position #3
And lastly, a shot of the back.  With our little patio.

So far it looks beautiful.  We are truly blessed.

C

Wednesday, October 2, 2013

Paint, Siding, Start of flooring, Driveway

Well this past week has been a whirlwind.  We spent a lot of time at the house, but I somehow managed to not get any pictures.  Let's start in chronological order.

The same week it was finished being drywalled, the house received its' fresh coat of white paint, to everything.  Our builder, Andy, gave us a few hours notice, and a couple evenings to paint what we wanted, before flooring started.  In hindsight, since floors will probably start going down today, we had a little more time than just a couple nights.  Anyway, last Monday, Tuesday, and Wednesday night were spent at the house painting.  Tuesday night, we had some special pros stop by to help us out.  So what we do have painted is the living, dining, kitchen, pantry, .5 bath, and the master suite.  As well as the front hallway, the upstairs hallway, and the laundry closet.  Painting goes so much quicker with no trim to tape off, and plywood floors to be messy all over.

While all this painting was going on, our house was sided.  It isn't quite finished yet, because I think they ran out of siding on one small patch on the side of the garage.  I think it looks fantastic, but I really haven't had too much time to study it in the light.

We went out to the house last night, and found that the driveway had been poured, along with the portion of sidewalk on the east side of the house.  It looks like they will probably pour the north side, and the walkway from the driveway to the front door, today.  The back patio was also poured.  The outside is really shaping up.  We also investigated the basement with our flashlights, and looked at all the plumbing and hvac work that had been done.  Our furnace is installed, along with most of the main trunk line.  Looks like the majority of the plumbing is done and the main drain line is all hooked up.

Andy told us this week should be flooring, next week trim, and that we are on schedule to be done within 45 days!!!

I'll try to get some pictures next time I am out there with some sunlight.

C

Monday, September 23, 2013

Drywall

This post is already about a week out of date.  Last week was a crazy week for me at work (or lack there of) since I was on a rewards trip from one of our suppliers.  Anyway, the house has been drywalled, taped, and mudded.  We had been told from the start that it would look a lot smaller after the drywall was hung, but Meg and I both seemed to think it looked just fine.  It was really neat to see all the rooms take shape, and to our suprise, how large some of them looked.

I'll get this post out of the way, and then hopefully I can get caught up to current progress.



C

Wednesday, September 11, 2013

Post Vacation update

Hard to believe it is already the middle of the week, but after being gone on vacation for a week, it is tough getting caught up.

As expected, it is much longer time periods between substantial progress, but when we got home Sunday and made it out to the house, we found a lot of things done.  Most, if not all, of the plumbing, hvac, and electrical rough in has been completed.  There were a bunch of inspection tags hanging on one of the outlets, but I couldn't tell if everything had been passed or there were still things missing that needed fixed.  Along with all the rough in, our garage doors had been hung as well.  The slider for the back door had also been installed.  So officially our house is all closed up.

Next step to be completed is insulation, which we hope is done by the end of the week.  And if everything is on schedule, they hope to start drywall on Monday!  I also noticed that the siding was stocked in the garage, so I could see that starting anytime now as well.

Time lapse position 1
What all the rough in in the kitchen looks like
Some of the rough in in the living room
High Five!

C

Thursday, August 29, 2013

Rough Ins

Well as expected, the lightning fast progress couldn't last forever.  In the past week, we have had our walkthrough with the electrician, and some plumbling and duct work has been roughed in.  Last Thursday we walked through the house with the electrician, who had hammered boxes in, and he showed us where everything would be.  He gave us the option of adding more, and telling him where we wanted switches, if where he had them didn't make sense to us.  We really didn't have much to change or add, so that went fairly quick.

We stopped out last night, and found the plumber leaving, and the HVAC guy was still there putting in ducts.  He was very nice, and explained to us what his job was, and pointed out a few things, so in the future we will know why it was done the way it was.  Our showers were installed, and some water and drain lines run.  Lots of holes cut through the floors and studs, and everywhere it seemed like. Our nice clean frame job is being hacked to pieces, but that is how it is, and after everything is finished, I'll never know the difference.  They are hoping that they are done by the end of the week with duct rough in.  And the electrician was letting him get all of that done before coming in and running wires, as he is much more flexible with his routes.

I didn't take any pictures as it was just a mess, but I wanted to leave a little update as to what is going on in our life.

C

Wednesday, August 21, 2013

Windows

Stopped by for a couple minutes last night.  It felt weird skipping a day of not going out there, after being there so many times over the weekend.  But sometime between Monday and Tuesday afternoon, the windows, front door, and door coming in from the garage were installed.  The back slider was not installed, because I think it never got ordered, as there was an extra set of windows sitting in the garage that were meant for the bump out space where we wanted the slider.  I'm trying to remember for sure, but I don't think that from the time the floor joists were put down to now, that we have had much, if any rain during construction.  And basically now it is all enclosed.  What a blessing!

Time lapse location 1.



Time lapse location 2.

The big hole in our living room, now has its' 3 windows installed.  Looks so much different!

Electrical walk through on Thursday afternoon!

C

Monday, August 19, 2013

Built with Love

Not too much to update on.  Last Friday, our garage floor and front porch cement were poured, and the roof was shingled as well.  What is fun to update on is the display of love our house is being built on.  This past weekend my cousin Amy was married.  The weekend was filled with love.  Since our new home was only a few miles from the church she was married in, Meg and I were able to show our home(so far) to a lot of my family.  Even before we have lived in our home, it is being filled with love, support, and encouragement tucked in the frame.  All of these things, both my family and Meg's family, give us daily.  We know that we are incredibly blessed to have the families that we do, and know that we would have nothing without all of them.

Time lapse location 1
Shingled roof... and if you look close the cement in the garage.

Displays love filling the framework our home.

C

Thursday, August 15, 2013

Framed! (Warning: Picture Heavy Post)

Two posts in one day, but I wanted to segregate the pictures, and the progress that was made in a short amount of time.  I was out of town from Monday afternoon until Wednesday afternoon.  It just happened that in that timeframe, our house was basically built.  We went from floor joists Sunday night, to a 95% framed/sheeted/wrapped house.  It is no longer a hole.  We don't go out to the site and look down, we now have to look up.  Way up!  Along with all the framing, the concrete was poured for the basement floor as well.  The crews were busy busy busy.

Timelapse location 1
Timelapse location 2
Garage side
Back side
Coming in the front door
Living Room
Living room running into dining area
Coming in from the garage into the kitchen running into dining area.... and Meg. :)
What Meg was observing... Vandals.
Not sure who this "Sarah" is, but she needs to stop writing nice things.

Upstairs!
And then I have random pictures of the different rooms, but it is hard to make much out, so I will spare you trying to figure out what is going on.

We saw this idea in different spots around the web, and thought it would be fun to do.  We are going to write some different Bible verses around the house.

Here is the first.  It is on the header over the front door.
Joshua 24:15  I know it is hard to read.  The last sentence is all that we wrote.
As for me and my house we shall serve the Lord.

There you have it friends.  A monster picture post.  Thanks for following along with our exciting journey.

C





2nd Floor

Huge progress has been made these past few days.  As of Sunday night, it was floor joists.  As of Tuesday night we had 2nd story framing almost complete.

Timelapse location 1
Timelapse location 2
Shot showing the backside.


C



Monday, August 12, 2013

Floor Joists

Friday was another busy day at the site.  I met Meg there after work, and we found a couple guys down in the basement putting in some drainage and digging the holes for the sump pits.  But on the top side, the floor joists had all been put down.  We are expecting a big week this week, and I am already anxious to see all the progress that is done while I am gone for a couple days.



C