Thursday, August 29, 2013

Rough Ins

Well as expected, the lightning fast progress couldn't last forever.  In the past week, we have had our walkthrough with the electrician, and some plumbling and duct work has been roughed in.  Last Thursday we walked through the house with the electrician, who had hammered boxes in, and he showed us where everything would be.  He gave us the option of adding more, and telling him where we wanted switches, if where he had them didn't make sense to us.  We really didn't have much to change or add, so that went fairly quick.

We stopped out last night, and found the plumber leaving, and the HVAC guy was still there putting in ducts.  He was very nice, and explained to us what his job was, and pointed out a few things, so in the future we will know why it was done the way it was.  Our showers were installed, and some water and drain lines run.  Lots of holes cut through the floors and studs, and everywhere it seemed like. Our nice clean frame job is being hacked to pieces, but that is how it is, and after everything is finished, I'll never know the difference.  They are hoping that they are done by the end of the week with duct rough in.  And the electrician was letting him get all of that done before coming in and running wires, as he is much more flexible with his routes.

I didn't take any pictures as it was just a mess, but I wanted to leave a little update as to what is going on in our life.

C

No comments:

Post a Comment