Wednesday, September 11, 2013

Post Vacation update

Hard to believe it is already the middle of the week, but after being gone on vacation for a week, it is tough getting caught up.

As expected, it is much longer time periods between substantial progress, but when we got home Sunday and made it out to the house, we found a lot of things done.  Most, if not all, of the plumbing, hvac, and electrical rough in has been completed.  There were a bunch of inspection tags hanging on one of the outlets, but I couldn't tell if everything had been passed or there were still things missing that needed fixed.  Along with all the rough in, our garage doors had been hung as well.  The slider for the back door had also been installed.  So officially our house is all closed up.

Next step to be completed is insulation, which we hope is done by the end of the week.  And if everything is on schedule, they hope to start drywall on Monday!  I also noticed that the siding was stocked in the garage, so I could see that starting anytime now as well.

Time lapse position 1
What all the rough in in the kitchen looks like
Some of the rough in in the living room
High Five!

C

Thursday, August 29, 2013

Rough Ins

Well as expected, the lightning fast progress couldn't last forever.  In the past week, we have had our walkthrough with the electrician, and some plumbling and duct work has been roughed in.  Last Thursday we walked through the house with the electrician, who had hammered boxes in, and he showed us where everything would be.  He gave us the option of adding more, and telling him where we wanted switches, if where he had them didn't make sense to us.  We really didn't have much to change or add, so that went fairly quick.

We stopped out last night, and found the plumber leaving, and the HVAC guy was still there putting in ducts.  He was very nice, and explained to us what his job was, and pointed out a few things, so in the future we will know why it was done the way it was.  Our showers were installed, and some water and drain lines run.  Lots of holes cut through the floors and studs, and everywhere it seemed like. Our nice clean frame job is being hacked to pieces, but that is how it is, and after everything is finished, I'll never know the difference.  They are hoping that they are done by the end of the week with duct rough in.  And the electrician was letting him get all of that done before coming in and running wires, as he is much more flexible with his routes.

I didn't take any pictures as it was just a mess, but I wanted to leave a little update as to what is going on in our life.

C

Wednesday, August 21, 2013

Windows

Stopped by for a couple minutes last night.  It felt weird skipping a day of not going out there, after being there so many times over the weekend.  But sometime between Monday and Tuesday afternoon, the windows, front door, and door coming in from the garage were installed.  The back slider was not installed, because I think it never got ordered, as there was an extra set of windows sitting in the garage that were meant for the bump out space where we wanted the slider.  I'm trying to remember for sure, but I don't think that from the time the floor joists were put down to now, that we have had much, if any rain during construction.  And basically now it is all enclosed.  What a blessing!

Time lapse location 1.



Time lapse location 2.

The big hole in our living room, now has its' 3 windows installed.  Looks so much different!

Electrical walk through on Thursday afternoon!

C

Monday, August 19, 2013

Built with Love

Not too much to update on.  Last Friday, our garage floor and front porch cement were poured, and the roof was shingled as well.  What is fun to update on is the display of love our house is being built on.  This past weekend my cousin Amy was married.  The weekend was filled with love.  Since our new home was only a few miles from the church she was married in, Meg and I were able to show our home(so far) to a lot of my family.  Even before we have lived in our home, it is being filled with love, support, and encouragement tucked in the frame.  All of these things, both my family and Meg's family, give us daily.  We know that we are incredibly blessed to have the families that we do, and know that we would have nothing without all of them.

Time lapse location 1
Shingled roof... and if you look close the cement in the garage.

Displays love filling the framework our home.

C

Thursday, August 15, 2013

Framed! (Warning: Picture Heavy Post)

Two posts in one day, but I wanted to segregate the pictures, and the progress that was made in a short amount of time.  I was out of town from Monday afternoon until Wednesday afternoon.  It just happened that in that timeframe, our house was basically built.  We went from floor joists Sunday night, to a 95% framed/sheeted/wrapped house.  It is no longer a hole.  We don't go out to the site and look down, we now have to look up.  Way up!  Along with all the framing, the concrete was poured for the basement floor as well.  The crews were busy busy busy.

Timelapse location 1
Timelapse location 2
Garage side
Back side
Coming in the front door
Living Room
Living room running into dining area
Coming in from the garage into the kitchen running into dining area.... and Meg. :)
What Meg was observing... Vandals.
Not sure who this "Sarah" is, but she needs to stop writing nice things.

Upstairs!
And then I have random pictures of the different rooms, but it is hard to make much out, so I will spare you trying to figure out what is going on.

We saw this idea in different spots around the web, and thought it would be fun to do.  We are going to write some different Bible verses around the house.

Here is the first.  It is on the header over the front door.
Joshua 24:15  I know it is hard to read.  The last sentence is all that we wrote.
As for me and my house we shall serve the Lord.

There you have it friends.  A monster picture post.  Thanks for following along with our exciting journey.

C





2nd Floor

Huge progress has been made these past few days.  As of Sunday night, it was floor joists.  As of Tuesday night we had 2nd story framing almost complete.

Timelapse location 1
Timelapse location 2
Shot showing the backside.


C



Monday, August 12, 2013

Floor Joists

Friday was another busy day at the site.  I met Meg there after work, and we found a couple guys down in the basement putting in some drainage and digging the holes for the sump pits.  But on the top side, the floor joists had all been put down.  We are expecting a big week this week, and I am already anxious to see all the progress that is done while I am gone for a couple days.