Well we are only a few short weeks away. A lot of the finishing touches are already in the process, or are done. In the past week or so, our counters have been put in. Our kitchen has been basically finished, and our fridge has been installed as well. Wire shelving in all of the closets have been put in, along with towel bars, tp holders, ect. Garage door openers installed, and wired. Plumbing all finished, so we have running water and drains everywhere. The painters came and touched up trim, along with painting our common grey color in the tall stairway walls. (both Meg and I were at a loss of ideas on how to accomplish getting that area painted) All of the door hardware has been installed. Basement has been insulated, and plastic covered. On the outside, the stone accent on the front of the house has been completed.
Small checklist left to do:
Outside: Final Grade/Seed Grass, Gutters, Light Post, AC unit.
Inside: Finish minor electrical, hvac, carpet, final clean, and energy diagnostic to get our energy star certified home.
Then it is just down to punch out, appraisal, and CLOSE!
C
No comments:
Post a Comment