Well this past week has been a whirlwind. We spent a lot of time at the house, but I somehow managed to not get any pictures. Let's start in chronological order.
The same week it was finished being drywalled, the house received its' fresh coat of white paint, to everything. Our builder, Andy, gave us a few hours notice, and a couple evenings to paint what we wanted, before flooring started. In hindsight, since floors will probably start going down today, we had a little more time than just a couple nights. Anyway, last Monday, Tuesday, and Wednesday night were spent at the house painting. Tuesday night, we had some special pros stop by to help us out. So what we do have painted is the living, dining, kitchen, pantry, .5 bath, and the master suite. As well as the front hallway, the upstairs hallway, and the laundry closet. Painting goes so much quicker with no trim to tape off, and plywood floors to be messy all over.
While all this painting was going on, our house was sided. It isn't quite finished yet, because I think they ran out of siding on one small patch on the side of the garage. I think it looks fantastic, but I really haven't had too much time to study it in the light.
We went out to the house last night, and found that the driveway had been poured, along with the portion of sidewalk on the east side of the house. It looks like they will probably pour the north side, and the walkway from the driveway to the front door, today. The back patio was also poured. The outside is really shaping up. We also investigated the basement with our flashlights, and looked at all the plumbing and hvac work that had been done. Our furnace is installed, along with most of the main trunk line. Looks like the majority of the plumbing is done and the main drain line is all hooked up.
Andy told us this week should be flooring, next week trim, and that we are on schedule to be done within 45 days!!!
I'll try to get some pictures next time I am out there with some sunlight.