Monday, October 28, 2013

Finishing touches...

Well we are only a few short weeks away.  A lot of the finishing touches are already in the process, or are done.  In the past week or so, our counters have been put in.  Our kitchen has been basically finished, and our fridge has been installed as well.  Wire shelving in all of the closets have been put in, along with towel bars, tp holders, ect.  Garage door openers installed, and wired.  Plumbing all finished, so we have running water and drains everywhere.  The painters came and touched up trim, along with painting our common grey color in the tall stairway walls. (both Meg and I were at a loss of ideas on how to accomplish getting that area painted) All of the door hardware has been installed.  Basement has been insulated, and plastic covered.  On the outside, the stone accent on the front of the house has been completed.

Small checklist left to do:
Outside:  Final Grade/Seed Grass, Gutters, Light Post, AC unit.
Inside:  Finish minor electrical, hvac, carpet, final clean, and energy diagnostic to get our energy star certified home.

Then it is just down to punch out, appraisal, and CLOSE!



C

Tuesday, October 15, 2013

Transformation Tuesday

Well, as we enter the last month of our building project, the details will become fewer and smaller.  So I thought this might be a fun time to post the progress of our time lapse photos all in one spot, to watch our home come alive.  Happy Transformation Tuesday, and here's to one month til our tentative close date!











C

Thursday, October 10, 2013

Hardwood, kitchen cabinets, and light???

Surprisingly busy week so far at the house.  We stopped out Monday night to find that the hardwood had been laid down in the kitchen, dining, living, .5, and hallway.  They are really dusty/dirty, and if they look like they are all scuffed up already, we picked the the hand scraped option, to give the floor some character, and let's face it, they won't look like new forever anyway.



Andy told us that they would be working on trim and cabinets as well this week, and we were feeling lucky so we went back to the house Tuesday night.  We not only found a majority of the downstairs trim(upstairs was already mostly done) but the cabinets have been set as well!  It was after dark until we made it out there, so no pics from Tuesday night.

Last night we met with the bank to get our financing in order, and when we left, it was still light, so we decided to try to get to the house before it got dark so we could see the cabinets.  As we approached the front door I noticed there was a doorbell and it was lit up, and then I noticed the light was hung under our covered porch.  I opened the door and started flipping switches.  WE HAVE LIGHTS!  Not all of them, but a lot of them, and it made exploring the house so much fun.  Trying switches here and there to see what all worked.

So here is a sneak peak of the kitchen, and living room.  Trimmed, with some lights. Ta da!


Oh, and assuming everything happens on schedule, both with the house and bank, we have set a tentative closing date of NOV 15th!!

C

Friday, October 4, 2013

Picture update

I know I am long over due for some pictures.  Meg and Sarah were working on a painting project, but I stopped by for a few minutes and grabbed a couple outside shots.  Concrete work is finished.  All the duct work for HVAC is finished.  Plumbing appears to be finished.  Outlets and light switch boxes wired.  Flooring still hasn't started.  Bummed about that.

Without further ado...

Time lapse position #1
Time lapse position #2
We are waiting for the stone work, and you can see the small patch on the garage wall where the siding isn't quite finished yet.
Time lapse position #3
And lastly, a shot of the back.  With our little patio.

So far it looks beautiful.  We are truly blessed.

C

Wednesday, October 2, 2013

Paint, Siding, Start of flooring, Driveway

Well this past week has been a whirlwind.  We spent a lot of time at the house, but I somehow managed to not get any pictures.  Let's start in chronological order.

The same week it was finished being drywalled, the house received its' fresh coat of white paint, to everything.  Our builder, Andy, gave us a few hours notice, and a couple evenings to paint what we wanted, before flooring started.  In hindsight, since floors will probably start going down today, we had a little more time than just a couple nights.  Anyway, last Monday, Tuesday, and Wednesday night were spent at the house painting.  Tuesday night, we had some special pros stop by to help us out.  So what we do have painted is the living, dining, kitchen, pantry, .5 bath, and the master suite.  As well as the front hallway, the upstairs hallway, and the laundry closet.  Painting goes so much quicker with no trim to tape off, and plywood floors to be messy all over.

While all this painting was going on, our house was sided.  It isn't quite finished yet, because I think they ran out of siding on one small patch on the side of the garage.  I think it looks fantastic, but I really haven't had too much time to study it in the light.

We went out to the house last night, and found that the driveway had been poured, along with the portion of sidewalk on the east side of the house.  It looks like they will probably pour the north side, and the walkway from the driveway to the front door, today.  The back patio was also poured.  The outside is really shaping up.  We also investigated the basement with our flashlights, and looked at all the plumbing and hvac work that had been done.  Our furnace is installed, along with most of the main trunk line.  Looks like the majority of the plumbing is done and the main drain line is all hooked up.

Andy told us this week should be flooring, next week trim, and that we are on schedule to be done within 45 days!!!

I'll try to get some pictures next time I am out there with some sunlight.

C

Monday, September 23, 2013

Drywall

This post is already about a week out of date.  Last week was a crazy week for me at work (or lack there of) since I was on a rewards trip from one of our suppliers.  Anyway, the house has been drywalled, taped, and mudded.  We had been told from the start that it would look a lot smaller after the drywall was hung, but Meg and I both seemed to think it looked just fine.  It was really neat to see all the rooms take shape, and to our suprise, how large some of them looked.

I'll get this post out of the way, and then hopefully I can get caught up to current progress.



C

Wednesday, September 11, 2013

Post Vacation update

Hard to believe it is already the middle of the week, but after being gone on vacation for a week, it is tough getting caught up.

As expected, it is much longer time periods between substantial progress, but when we got home Sunday and made it out to the house, we found a lot of things done.  Most, if not all, of the plumbing, hvac, and electrical rough in has been completed.  There were a bunch of inspection tags hanging on one of the outlets, but I couldn't tell if everything had been passed or there were still things missing that needed fixed.  Along with all the rough in, our garage doors had been hung as well.  The slider for the back door had also been installed.  So officially our house is all closed up.

Next step to be completed is insulation, which we hope is done by the end of the week.  And if everything is on schedule, they hope to start drywall on Monday!  I also noticed that the siding was stocked in the garage, so I could see that starting anytime now as well.

Time lapse position 1
What all the rough in in the kitchen looks like
Some of the rough in in the living room
High Five!

C